BOX CULVERT REALIGNMENT

Box Culvert Realignment Project Information in Erskineville

Where: 

Erskineville, NSW

When: 

2016

Summary: 

  • 200m of box culvert stormwater with alignment containing a number of horizontal curves
  • Place concrete blinding layer
  • Construct heavily reinforced concrete base slab with reinforced concrete benching
  • Install 3600 x 1800 box culverts with 130t crane
  • Waterproofing and grouting of culverts
  • Form, reinforce and pour 3 large concrete structures in excess of 4 metres wide and 3 metres deep in live stormwater line
  • Connection to live Sydney Water stormwater network