SHELL COVE MARINA

Shell Cove Marina Project Information in Shellharbour

Where: 

Shellharbour, NSW

When: 

2016

Summary: 

  • More than 7000m3 of bulk excavation
  • Supply and lay approx. 5000m of stormwater pipe
  • Approximately 1000m of stormwater large stormwater pipe (>900mm diameter)
  • 200 plus precast stormwater pits
  • A number of large cast in-situ reinforced concrete stormwater structures
  • More than 2000m of subsoil drainage